The 727 Legacy Project
  • Home
  • The Story
  • Build Updates
  • About Us
  • Photos

Some Instagram Shots of our Simulator


Phase One Completion


Backwall built and installed.


Building the Weather Radar.



Real Ipeco B727 Seats!


Main Instrument Panel Completed.


PFC yoke columns installed with original faceplates.


Flight engineer panel is assembled, work begins on main instrument panel.


Shell assembly is completed, work begins on cockpit lighting.


Low-Profile MDF Floor


Disassembly begins!


727-100 CPT before disassembly at Fedex Flight Training


Our visit to the FedEx Level-D 727-200 simulator

The 727 Legacy Project © 2018
  • Home
  • The Story
  • Build Updates
  • About Us
  • Photos